The Company’s DLE facility in Calgary includes a satellite lab operated by AGAT Laboratories. The on-site, 3
rd party, AGAT Lab is a vital piece of equipment that allows real time assay results during the piloting campaign on a 24-hour basis. This helps ensure efficient processing and allows for real time adjustments as and when required. To ensure Quality Assurance and Quality Control (“QA/QC”) standard reference material was used on a regular basis as well as duplicate samples that were run at the on-site lab and at AGAT’s main lab in Calgary.
The Company would also like to comment on disclosure initially made on September 11, 2024, when it announced that a portion of the DLE pilot plant was operating over a period of four and a half days continuously for 120 hours. For clarity, after further audit the plant had an uptime of 95% during this operating period. Furthermore, the audit indicated that a total of 29,000L of brine was put through the adsorption portion of the piloting process and not the previously stated 40,000L of brine.
Qualified PersonThe information that forms the basis for the scientific and technical information disclosed in this news release was prepared and approved Viraj Patel, P.Eng., who is a Qualified Person (QP) for the purposes of National Instrument 43-101. Mr. Viraj Patel consents to the inclusion of the data in the form and context in which it appears.
About LithiumBank Resources Corp.LithiumBank Resources Corp. (TSX-V: LBNK) (OTCQX: LBNKF), is a publicly traded lithium company that is focused on developing and de-risking the largest portfolio of lithium brine assets in North America. The Company has completed a NI 43-101 Preliminary Economic Assessment (“PEA”) at Boardwalk (
Jan. 16, 2024), an initial NI 43-101 Resource Estimate at Park Place (
June 24, 2024) which are both located in west central Alberta. The Company is currently conducting large scale pilot testing of a licensed Direct Lithium Extraction (“DLE”) technology at the Company’s facility in Calgary (since
July 10, 2024). The DLE technology process being piloted is currently being used at a commercial scale for use in other metals. The Company owns 100% of the 2,130,470 acres of brown-field brine hosted mineral licenses within Alberta and Saskatchewan
.Contact:Rob Shewchuk CEO & Director
rob@lithiumbank.ca(778) 987-9767
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.Cautionary Statement Regarding Forward Looking Statements This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, including statements regarding future estimates, plans, objectives, timing, assumptions or expectations of future performance, including without limitation, that LithiumBank expects to process brine from the Company’s own licensed well 10-6 in future pilot campaigns , are forward-looking statements and contain forward-looking information. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as “intends” or “anticipates,” or variations of such words and phrases or statements that certain actions, events or results “may,” “could,” “should” or “would” or occur.