Timberline Reports on Drill Test of IP Anomaly and Final Assays from BHSE-220C

Coeur d’Alene, Idaho – March 24, 2022 – Timberline Resources Corporation (OTCQB: TLRS; TSX-V: TBR) (“Timberline” or the “Company”) announce the results today from two core holes from the 6,536-meter (m) 2021 drilling program at its 100%-controlled Eureka Project in Nevada. These include the final assays from drill hole BHSE-220C, a portion of which was previously reported…

Eskay Mining Identifies Numerous New Precious Metal Rich VMS Targets in Preparation for its 2022 Drill Campaign

TORONTO, ON / ACCESSWIRE / March 21, 2022 / Eskay Mining Corp. (“Eskay” or the “Company”) (TSXV:ESK)(OTCQX:ESKYF)(Frankfurt:KN7)(WKN:A0YDPM) is pleased to announce it has defined numerous new drill targets in three focus areas at its 100% controlled Consolidated Eskay precious metal rich volcanogenic massive sulfide (“VMS”) project, British Columbia from recently received soil and rock chip analyses.…

Eloro Resources Intersects 182.34g Ag eq/t (29.85g Ag/t, 1.01% Zn, 0.64% Pb, 0.11% Cu and 0.11% Sn) over 351.0m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections in hole METSBUG-01 of: 261.14g Ag eq/t (24.65g Ag/t, 0.15% Zn, 0.14% Pb, 0.81% Cu and 0.19% Sn) over 22.56m 599.26g Ag eq/t (208.14g Ag/t, 0.28% Zn, 0.51% Pb, 0.56% Cu and 0.41% Sn) over 17.60m 324.72g Ag eq/t (12.49g Ag/t, 1.88% Zn, 1.26% Pb, 0.02% Cu and 0.31% Sn) over 30.01m 292.78g Ag…